G3-S Production Instructions

YAMAHA TDM 850 1992

Note: Click on the images to enlarge.

1. Banjo line out of head at 35 degrees right and down.
 

2. With adjusters facing down clock shock body at 60 degrees with body opening facing up and right.
 

 

3. Clamp reservoir in vice with adjusters facing down and reservoir opening facing you. Locate the reservoir mouting bracket 29mm from the open end of reservoir. Clock the reservoir mounting bracket at 87 degrees right and down. 
 

4. Attach the frame mount bracket long end up as shown. Use a bit of Loctite on the bolts when securing the bracket. Torque on the Allen bolts should be 6ft/lbs. picture 273

 

5. FOR REFERENCE.