IP SK VALVING BFRC
Shock Gold Valve InstallationVALVING INSTRUCTIONS – SHOWA BFRC | |||||||
Tools – Torque wrench (SnapOn Digital Torque Wrench shown) – Metric calipers and micrometer - TMVJ 065 Vise Jaws mounted on a Vise – suggested - TSCP 01 – Clip Tool Supplies Contact Cleaner – or other good, clean solvent Loctite – Hi-Strength (included in the Gold Valve Kit) USSG 01 – Ultra Slick Seal Grease | |||||||
SD1 – Once the Valving Assembly has been removed from the shock remove the valving shaft nut. Unlike standard Showa shocks the nut is not peened on. Simply unscrew the nut. Save and re-use the stock nut. | |||||||
You will either be building a Single Stage or a Two Stage Stack (or possibly a combination of both). The difference is the Crossover. The Crossover is a smaller diameter shim between the Lo-Speed and the Hi-Speed Stacks. Look for this shim in the valving stack listed in the DVS. If it is not there it is a single stage stack. Note: The DVS Custom Setup Sheet displays individual shims and does not label Hi-Speed, Crossover, and Lo-Speed. This is for your information only. Also you will not use all the shims provided in the Gold Valve Kit.
| |||||||
V2- IDENTIFY THE 3 AND 6 PORT SIDES OF THE PISTONS The 3 port side is on the left – this side faces up The 6 port side is on the right – this side faces down | |||||||
V3- Rebound Assembly Assembly order: Cupped Washer (cup facing up) Check Sleeve (new – provided in kit) Check Spring Wave Washer (use stock) Check Plate (16 id x34 od x.50 thick – provided) Gold Valve – 3 Port Side up, 6 Port Side down (rebound and compression Gold Valves are identical and the 3 port side faces up on both – critical) For Two Stage the total Rebound valving stack is made up of a: Hi-Speed Rebound Stack Rebound Crossover and a Lo-Speed Rebound Stack Note: The DVS Custom Setup Sheet displays individual shims and does not label Hi-Speed, Crossover, and Lo-Speed. (this is only an example – not your setting) The Total Valving Stack starting from the Gold Valve piston face: (4) .20×34 – Lo- Speed Stack (1) .15×22 – Crossover (notice the smaller diameter) (1) .25×34 – Hi- Speed Stack (1) .30×32 (1) .30×30 (1) .30×28 (1) .30×26 (1) .30×24 (1) .30×22 (1) .30×20 Install the rebound valving stack in the order that it is listed, starting with the largest diameter shim of the Lo-Speed Rebound Stack, then the Crossover, then the largest diameter shim of the Hi-Speed Rebound Stack tapering down to the smallest. | |||||||
V4- Make sure the Rebound Valving Stack Height is correct. Critical!! | |||||||
V5- Compression Assembly Note: If Spacing Shims are required to achieve the correct Total Valving Stack Height they will be placed directly on top of the Bleed Base Plate. (see the next step) For Two Stage the total Compression valving stack is made up of a: Hi-Speed Compression Stack Compression Crossover and a Lo-Speed Compression Stack Note: The DVS Custom Setup Sheet displays individual shims and does not label Hi-Speed, Crossover, and Lo-Speed. (this is only an example – not your setting) The Total Valving Stack starting from the Gold Valve piston face: (4) .20×34 – Lo- Speed Stack (1) .15×22 – Crossover (notice the smaller diameter) (1) .25×34 – Hi- Speed Stack (1) .30×32 (1) .30×30 (1) .30×28 (1) .30×26 (1) .30×24 (1) .30×22 (1) .30×20 Install the compression valving stack in the REVERSE order that it is listed, starting with the smallest diameter shim of the Hi-Speed Compression Stack tapering up to the largest, then the Compression Crossover, then the Lo-Speed Compression Stack. Install the Compression Gold Valve (3 Port side up, 6 Port side down). Check Sleeve (new – provided in kit) Check Plate (16 id x34 od x.50 thick – provided) Cupped Washer (cup facing down) | |||||||
V6- Make sure the Total Valving Stack Height is correct. Critical!! This step is here to insure you don't "run out of thread" onto the straight, non-threaded, portion of the shaft when tightening the Nut. If needed, height adjustment is done with Spacing Shims added just above the Bleed Base Plate below the Comression Valving Stack. Spacing Shims must be larger in diameter than the smallest shim in the stack. Click images to enlarge.
| |||||||
V7- Re-use the stock nut. Clean everything completely. Use Hi-Strength Loctite (included) on the shaft nut. Make sure the Check Plates move freely before you tighten the Nut. Install and torque the shaft nut to the proper setting (see the DVS) using a torque wrench. This is critical! | |||||||
V8- Single Stage Compression and Rebound Examples on conventional shocks (but you get the idea). | |||||||
V10- Visually check your work. Hold the completed valving assembly up to the light and look for any irregularities. Make sure the shims are laying flat on the piston surface. On two stage stacks check that the Crossover Gap is clearly visible. If there are any problems, disassemble the stack and look for dirt, bent shims, or any other causes. Reassemble and inspect again. You might be thinking that this looks like either a very tiny shock shaft or a fork compression valve. Well, you're right, it's a very tiny shock shaft. You get the idea. | |||||||
V11- Make sure the shims that go next to the Gold Valve completely cover the ports on both sides of the piston! If the ports are not covered there will not be enough damping. This could be caused by a number of reasons. Piston upside down, Compression and Rebound Stacks reversed on location or installed upside down. Please call Tech Support if this occurs and you can't figure it out. | |||||||
V12- Return to the main Rebuild instructions to complete the reassembly. |
• Single Stage - made of: There is NO Crossover | ||
• Two Stage - made of: The Crossover Gap is visible |